Study material
Engineering
Computer Engineering
Information Technology
Electrical Engineering
Civil Engineering
Mechanical Engineering
Electronics and Communications
Electronics and Telecommunication
Electrical and Electronics
B.Com
B.A
BBA
BAF
BMS
New Test BE-Btech
Demo BE-Btech
Prod BE-BTech
Blog
Log in
Become a data analyst in the next 4 months and kickstart your career.
100% placement assistance.
Start your Analytics journey with our free
Python course.
Explore Now
Home
Universities
Savitribai Phule Pune University, Maharashtra
Civil Engineering
Quantity Surveying, Contracts and Tenders
Savitribai Phule Pune University, Maharashtra, Civil Engineering Semester 8, Quantity Surveying, Contracts and Tenders Syllabus
Quantity Surveying, Contracts and Tenders Lecture notes
|
Videos
|
Free pdf Download
|
Previous years solved question papers
|
MCQs
|
Question Banks
|
Syllabus
Get access to 100s of MCQs, Question banks, notes and videos as per your syllabus.
Try Now for free
Unit - 1 Introduction and Approximate Estimates
UNIT 1
Introduction to Estimates and Related Terms
1.1 Definition of Estimate
1.2 Definition of Valuation
1.3 Purpose of Estimating
1.4 Types of Estimates
1.5 Data required for estimation as a pre requisite
1.6 Meaning of an Item of works
1.7 Item of work
1.8 Unit of measurement and principles deciding the units
1.9 Mode of measurement of building works
1.10 Rules for deduction
1.11 Face sheet
1.12 Abstracting
1.13 Bill of Quantities
1.14 Measurement sheet
1.15 Lead statement
1.16 Provisional cost of items
1.17 Prime cost of items
1.18 Contingencies
1.19 Work charge Establishment
1.20 Centage charges
1.21 Introduction to schedule of Rates D.S.R
1.22 Meaning of Approximate Estimate
1.23 Purpose
1.24 Method of approximate estimating of building
1.25 Method of preparation of Estimate for Road Project
1.26 Method to find out approximate cost for water supply sanitary and Electrical works
1.27 Cost of water supply
1.28 Cost of sanitation
1.29 Cost of Electrical works
Unit - 2 Taking out quantities & Detailed estimate up to plinth
Unit 2
Method of Estimating
2.1 Method of taking out Quantities
2.2 Factor considered while preparing detailed estimate
Unit - 3 Detailed Estimation for super structure & Valuation
Unit 3
Detailed estimation for super structure
3.1 Detailed estimate
3.2 Valuation
3.3 Purpose of valuation
3.4 Method of valuation of building
3.5 Some definition
3.6 Factor affecting the value of property
3.7 Type of value
3.8 Concept of free hold property
3.9 Concept of leasehold property
3.10 Difference between estimation and valuation
3.11 Depreciation
3.12 Method of calculations of depreciation
3.13 Sinking fund
3.14 Year purchase
3.15 Obsolescence
Unit - 4 Specifications and Rate Analysis
Unit – 4
Specifications and Rate Analysis
4.1 Specifications
4.2 Purpose of specifications
4.3 Types of specification
4.4 Requirements of good specification
4.5 Detailed specification for common item of building work
4.6 Rate analysis
4.7 Purpose of rate analysis
4.8 Factor affecting rate analysis
4.9 Market rate of material
4.10 Estimating labour
4.11 Task work out turn
4.12 Factor affecting the task work
4.13 Transportation of materials and it cost.
Unit - 5 Tendering and Execution of Works
UNIT 5
Tendering and Execution of Work
5.1 Definition
5.2 Methods of inviting Tenders
5.3 Tender Notice
5.4 Tendering procedure
5.5 Pre qualification of contractors
5.6 Tender Documents
5.7 Bid capacity
5.8 Comparative statement of Tender
5.9 Pre bid conference
5.10 Acceptance of Tender
5.11 Rejection of Tender
5.12 Build Operate Transfer B. O. T and it’s various forms.
5.13 Global Tender
5.14 E tendering
5.15 Unbalanced Tender
5.16 Detection of unbalanced bid
5.17 Bidding system
5.18 Method of Executing works.
5.19 Administrative Approval
5.20 Budget provision
5.21 Technical sanction
5.22 Different Method of Execution of minor work in PWD
5.23 Muster Roll
5.24 Introduction to registration as contractor in P. W. D.
Unit - 6 Contracts and Arbitration
Unit 6
Contract and Arbitration
6.1 Contract
6.2 Objective of contract
6.3 Essential of valid contract
6.4 Termination of contract
6.5 Types of contract
6.6 Conditions of contract
6.7 Government conditions of contract
6.8 FIDIC document
6.9 Important conditions regarding Addition
6.10 Defect Liability period
6.11 Liquidated damage
6.12 Retention money
6.13 Interim payment
6.14 Advance payment
6.15 Secured advance
6.16 Final bill
6.17 Introduction to arbitration
6.18 Need for arbitration
6.19 Power of arbitrator
6.20 Qualification of arbitrator
6.21 Qualities of arbitrator
6.22 Type of arbitration
6.23 Professional Liability
Download CIVIL Sem 8 syllabus pdf
Get access to 100s of MCQs, Question banks, notes and videos as per your syllabus.
Try Now for free
Other Subjects of Semester-2
Dams and hydraulic structures
Popular posts
Top 10 civil engineering colleges in India
What is tacheometry
All about toposheets
Disaster management explained
What is depreciation
Share
Link Copied
More than
1 Million
students use Goseeko! Join them to feel the power of smart learning.
Try For Free
Spot anything incorrect?
Contact us